0102030405
Instructions for installing secondary water supply equipment
2024-08-02
Secondary water supply equipmentInstallation and maintenance details are essential to ensure proper operation and龙8头号玩家:water supplyStability is crucial.
The following is aboutSecondary water supply equipmentDetailed data and procedures for installation and maintenance:
1.Installation details
1.1 Location selection
- Environmental requirements:
- temperature range:0°C - 40°C
- Humidity range: ≤ 90% RH (no condensation)
- Ventilation requirements: Good ventilation, avoid direct sunlight and rain
- Basic requirements:
- basic materials: Concrete
- Foundation thickness:≥ 200 mm
- levelness:≤ 2 mm/m
- space requirements:
- operating space: Leave at least 1 meter of operation and maintenance space around the equipment
1.2 Pipe connection
- water inlet pipe:
- Pipe diameter: Should be no less than the diameter of the water inlet of the equipment
- Material: Stainless steel, PVC, PE, etc.
- Filter pore size:≤ 5 mm
- Check valve pressure rating:PN16
- Gate valve pressure rating:PN16
- Outlet pipe:
- Pipe diameter: Should not be less than the diameter of the equipment outlet
- Material: Stainless steel, PVC, PE, etc.
- Check valve pressure rating:PN16
- Gate valve pressure rating:PN16
- Pressure gauge range:0-1.6 MPa
1.3 Electrical connection
- Power requirements:
- Voltage: 380V ± 10% (three-phase AC)
- frequency:50Hz ± 1%
- Power cord cross-sectional area:Selected according to equipment power, usually 4-16 mm²
- Ground protection:
- Ground resistance:≤ 4Ω
- control system:
- Launcher type: Soft starter or frequency converter
- Sensor type: Pressure sensor, flow sensor, liquid level sensor
- control Panel: With LCD display to display system status and parameters
1.4 Trial run
- examine:
- Pipe connection: Make sure all pipes are firmly connected and there is no leakage.
- Electrical connection: Make sure the electrical connections are correct and well grounded
- add water:
- Amount of water added: Fill the equipment and pipes with water and remove the air
- start up:
- Start time: Start the equipment step by step and observe the operation status
- Operating parameters: Flow, head, pressure, etc.
- debug:
- Traffic debugging: Adjust the flow rate according to actual needs to ensure that water needs are met
- Pressure debugging: Debugging pressure according to actual needs to ensure system stability
2.Maintain detailed data
2.1 Daily inspection
- Running status:
- noise:≤ 70 dB
- vibration:≤ 0.1 mm
- temperature: ≤ 80°C (motor surface)
- Electrical system:
- Wiring firmness: Check whether the wiring is loose
- Ground resistance:≤ 4Ω
- piping system:
- Leak inspection: Check the piping system for leaks
- Blockage check: Check whether there is any blockage in the piping system
2.2 Regular maintenance
- lubricating:
- Lubricating oil type: Lithium-based grease
- Lubrication cycle: Added every 3 months
- clean:
- cleaning cycle: Clean every 3 months
- clean area: Equipment shell, pipe inner wall, filter, impeller
- Seals:
- Inspection cycle: Check every 6 months
- Replacement cycle: Replace every 12 months
2.3 Annual maintenance
- Disassembly inspection:
- Inspection cycle: Conducted every 12 months
- Check content: Wear of equipment, impellers, bearings, and seals
- Replacement parts:
- Replacement cycle: Replace seriously worn parts based on the inspection results.
- Replacement parts: Impeller, bearings, seals
- Motor maintenance:
- Insulation resistance:≥ 1MΩ
- Winding resistance: Check according to motor specifications
2.4 Records Management
- Operation record:
- Record content: Equipment operating time, flow, head, pressure and other parameters
- Recording period:Daily record
- Maintain records:
- Record content: Contents and results of each inspection, maintenance and overhaul
- Recording period: Recorded after each maintenance
| Fault | Cause analysis | Treatment method |
Device does not start |
|
|
The device does not produce water |
|
|
The equipment is noisy |
|
|
Equipment leaks |
|
|
Insufficient device traffic |
|
|
Insufficient equipment pressure |
|
|
Control system failure |
|
|
Through these detailed faults and processing methods, you can effectively solve龙8头号玩家:Secondary water supply equipmentproblems encountered during operation, ensure that they are龙8头号玩家:water supplyIt can operate normally during the process, thereby effectively meeting the water needs of users.




